Fee Schedule
Building permit fees are estimated at the time of application. The estimate must be paid in full before plans review begins. During plans review the examiners will verify the fees. Any balance owing must be paid before the permit is issued.
The following by-law applies to all applications submitted after December 31, 2024.
Our current fees listed below are summarized from Schedule A of Markham's Building By-law #2024-206.
 Public meeting Scheduled on November 10th, 2025.  Please click link for details Notice of Building By-Law Fee Change
 
Minimum Permit Fees
| Description | Fee | 
|---|---|
| Group C Residential construction | $125 | 
| Group A, B, D, E and F occupancies | $525 | 
| Private servicing of multiple lots (plumbing fees in addition to this fee) | $2,125 | 
| Non-residential Demolition | $1,500 | 
- Administrative Fees
 Row Description 
Fee 
1.1 Transfer application to another permit applicant or change project address 
$300 
1.2 Transfer permit to another Owner 
$300 
1.3 Add additional contacts to permit record for Building Inspection correspondence $125 per permit record 1.4 Building complaint leading to issuance of an Order $150 1.5 Order to Comply 
$500 
1.6 Subsequent visit or file review to determine compliance with Order to Comply $190 per hour 
(minimum 1 h)1.7 Stop Work Order 
$1,500 
1.8 Unsafe Building 
$800 
1.9 Initial Site Visit related to Unsafe Building conducted after hours $190 per hour 
(minimum 3 h)1.10 Order Respecting Occupancy 
$1,500 
1.11 Subsequent Visits / File Review to determine compliance with an Unsafe Building or Order Respecting Occupancy 
$190 per hour 
(minimum 1 h during business hours; 3 h outside of business hours)1.12 Order to Comply or Stop Work Order issued prior to building permit 
50% of permit fee 
(maximum $5000)
1.13 Order Maintenance Fee $1,000 1.14 Additional Inspections due to non-remedied infraction 
$300 
1.15 Additional Inspection due to work not sufficiently complete 
$200 
1.16 Extend permit expiry date past 12 months 
2x Permit Fee 
(maximum $3000)
1.17 Suspended permit / incomplete 
$400 for housing 
$825 for non-housing (Annual charge)
1.18 Permit Maintenance Fee for infill residential permits $2,000 1.19 Septic Maintenance Fee $300 1.20 Registration of an Order on Title $500 
- General Permit Fees
 
Row Description 
Fee 
2.1 
Pre-Application Review 
$100 
2.2 
Supplementary submissions, shop drawings, and permit revisions 
$125 per hour 
2.3 Resubmission to address incorrectly declared Applicable Law $300 2.4 Revisions to forms due to incorrectly declared information $250 2.5 Partial permit fee for non-housing (when requested after permit application) 
$1000 
2.6 Alternative Solution — first submission 
$3,500 for multiple-unit residential and non-residential 
$800 for low rise residential
2.7 Alternative Solution — supplementary submission 
$300 each 
2.8 Certified Model Supplemental Reviews (additional elevations, corner upgrade, rear upgrade, alternate floor layout, walk-out condition, look-out condition) $125 each 2.9 Change of Certified Model to existing Repeat Permit 
$300 plus difference in permit fees 
2.10 
Fee not listed in Building Bylaw 
$40 for every $1,000 of Construction Value 
2.11 
Remediation / demolition of premises used for production of illicit drugs 
$5,000 
2.12 
Reinstallation of a previously approved Air Supported Structure 
$1,000 
- Service Fees
 Row 
Description 
Fee 
3.1 
Certificate of Completion 
$200 
3.2 
Compliance Letter 
$200 
3.3 
Provincial License Applications (without a permit application) 
$500 
3.4 
Provincial License Applications (with a permit application) 
$250 
3.5 
Spatial Separation Agreements 
$500 
3.6 
Zoning Preliminary Review – Low Rise Residential 
$300 
3.7 
Zoning Preliminary Review – Interior alteration (including parking calculations) 
$750 per unit 
3.8 
Zoning Preliminary Review — multiple-unit residential and non-residential projects 
$1800 per building 
3.9 
Zoning Preliminary Review — Land Division 
$1200 per lot 
3.10 Zoning Preliminary Review — supplemental submissions $125 per hour 3.11 
Zoning Searches 
$125 
3.12 
Pre-Permit Consultation — per discipline 
$800 for first submission 
$300 for each resubmission
3.13 Reproduction of Documents $60 plus 110% cost of reproduction plus $125 per hour 
- New Buildings and Additions (including Mezzanines or New Intermediate Floors)
 Row 
Description 
Fee 
Group A Assembly 
A1 
Transportation Terminals 
$23.15 per square metre 
A2 
Portable classrooms (each) (new or relocated) 
$707 each 
A3 
Outdoor Pool 
$16.16 per square metre 
A4 
All Other Assembly Occupancies 
$27.82 per square metre 
Group B: Institutional 
A5 
All Institutional Occupancies 
$30.11 per square metre 
Group C: Residential 
A6 
Single Detached Dwelling (SDD) 
$21.03 per square metre 
A7 Infill Residential Dwelling $23.57 per square metre A8 
Multiple Unit buildings less than 4 storeys high 
$26.12 per square metre 
A9 
Multiple Unit buildings greater than 3 storeys, less than 13 storeys 
$26.12 per square metre 
A10 
Multiple Unit buildings greater than 12 storeys high, less than 66 storeys or 250 m in height 
$19.40 per square metre 
A11 Multiple Unit buildings greater than 65 storeys or 250 m in height $19.02 per square metre A12 
Repeat of Previously approved Certified Model 
$17.24 per square metre 
A13 
Hotel / Motel 
$27.82 per square metre 
A14 
Unfinished Basement / Foundations 
$7.17 per square metre 
A15 
Detached or semi-detached garage/carport 
$673 each 
A16 
Garage incorporating a dwelling unit (GDU) 
$1,964 each 
A17 
Repeat of previously approved GDU 
$1,220 each 
A18 
Accessory utility building (ie. Garden shed, Gazebo) less than 20 m2 
$144 each 
A19 
Accessory utility building (ie. Garden shed, Gazebo) 20 m2 or greater 
$927 each 
A20 Single Detached Dwelling Unit (SDD) less than 37 m2 in building area $1,927 each A21 
Deck / Balcony / Covered Porch (each) 
$144 each 
Group D: Business and Personal Services 
A22 
Shell Only (including unfinished basement) 
$17.94 per square metre 
A23 
Partitioned / Finished / Mezzanine 
$23.15 per square metre 
A24 
Temporary Real Estate Sales Office 
$2,728 each 
Group E: Mercantile 
A25 
Shell Only (including unfinished basement) 
$15.08 per square metre 
A26 
Partitioned / Finished / Mezzanine 
$19.74 per square metre 
Group F: Industrial 
A27 
Shell Only (including unfinished basement) 
$11.66 per square metre 
A28 
Partitioned / Finished / Mezzanine 
$16.14 per square metre 
A29 
Gas Station / Canopy, Car Wash 
$14.90 per square metre 
A30 
Repair garage 
$16.14 per square metre 
A31 
Parking Garage (underground, open air) 
$11.66 per square metre 
A32 
Rack Storage Systems regulated by the Building Code 
$11.66 per square metre 
Group G: Agricultural A33 High-Hazard Agricultural (G1) $11.66 per square metre A34 Other Agricultural (G2) $10.38 per square metre A35 Greenhouse Agricultural (G3) $9.36 per square metre A36 Agricultural with no human occupants (G4) $8.34 per square metre All Occupancies 
A37 
Permanent Tent / Air supported structure 
$8.34 per square metre 
A38 
Repair / reclad wall or replace roof structure 
$2.15 per square metre 
A39 
Ceiling (new or replacement) 
$0.58 per square metre 
A40 
Mechanical Penthouse 
$11.66 per square metre 
A41 
Temporary Building (Tent, Stages) 
$299 each 
A42 
Shoring (/m of length) 
$17.94 per square metre 
A43 
Underpinning (/m of length) 
$17.94 per square metre 
A44 Design of Hazardous Areas regulated by the Building Code $30.11 per square metre A45 Multiple Unit Encapsulated Mass Timber Buildings greater than 3 storeys $30.11 per square metre Designated Structures 
A46 
Communication Tower 
$428 each 
A47 
Crane Runway 
$637 each 
A48 
Exterior Storage Tank 
$428 each 
A49 
Pedestrian Bridge (/m of length) 
$49.71 per metre 
A50 
Retaining Wall (/m of length) 
$24.88 per metre 
A51 
Sign regulated by the Building Code 
$428 each 
- Alteration, Repair or Change of Use (Existing Construction)
 Row 
Description 
Fee 
Group A Assembly 
B1 
Restaurant 
$11.62 per square metre 
B2 
All other assembly occupancies 
$8.02 per square metre 
Group B: Institutional 
B3 
All institutional occupancies 
$8.02 per square metre 
Group C: Residential 
B4 
Accessory Apartment 
$21.03 per square metre 
B5 
All other Residential occupancies 
$8.02 per square metre 
B6 
Exterior door or door from garage into dwelling 
$474 each 
B7 
Below grade stair 
$474 each 
B8 
Elevator (Housing Permits only) 
$474 each 
Group D: Business and Personal Services 
B9 
All business and personal service occupancies 
$8.02 per square metre 
Group E: Mercantile 
B10 
Restaurant 
$11.62 per square metre 
B11 
All other mercantile occupancies 
$8.02 per square metre 
Group F: Industrial 
B12 
All industrial occupancies 
$7.31 per square metre 
All Occupancies 
B13 
Electromagnetic Locking Device 
$707 first device plus $142 per additional device 
B14 
Parking Structure Repair 
$2.15 per square metre 
B15 
Balcony Guard Replacement (/m of length) 
$2.60 per metre 
B16 
Window Replacement or Enlargement (each) 
$8.96 each B17 Special Ventilation Systems (each) $697 
- Demolition
 Row 
Description 
Fee 
Group C: Residential Housing 
C1 
Single / Semi-detached dwelling 
$722 each 
C2 
Accessory building serving residential housing 
$241 each 
All Other Occupancies 
C3 
Complete / Partial / Interior Demolition 
$0.21 per square metre 
($1,500 minimum fee)
- Mechanical and Fire Protection Work
 These fees apply to projects where mechanical or fire protection work is a stand-alone project.
Row 
Description 
Fee 
D1 
Heating, ventilation, air conditioning 
$1.40 per square metre 
D2 
Fire Alarm System (per storey) 
$465 per storey 
D3 
Replacement Annunciator/Control Panel only (per storey served) 
$465 per storey 
D4 
Sprinkler System 
$1.40 per square metre 
D5 
In-rack sprinkler System 
$1.40 per square metre 
D6 
Standpipe System (per riser) 
$182 per riser 
D7 
Emergency Power 
$896 
D8 
Emergency Lighting (per storey) 
$239 per storey 
D9 
Fireplace / Woodstove 
$144 
D10 
Heating plant replacement 
$233 
- Plumbing
 Plumbing fees apply to all projects except for new single detached dwellings, new semi-detached dwellings, and new multiple unit residential buildings less than 4 storeys high.
Row 
Description 
Fee 
E1 
Residential Service Connection (per lot) 
$218 per lot 
E2 
Fixture 
$21.29 each 
E3 
Appliance 
$21.29 each 
E4 
Rain Water Hopper 
$21.29 each 
E5 
Conversion from Septic System to sewer 
$546 
E6 
Backflow preventer 
$328 (first device) $109 per additional devices 
E7 
Water service (/length in m) 
$21.29 per metre 
E8 
Building sanitary/storm drain, building sanitary/storm sewer (/length in m) 
$21.29 per metre 
E9 
Replacement or re-lining of water distribution piping (/length in m) 
$21.29 per metre 
E10 
Manhole 
$62.78 each 
E11 
Catchbasin 
$62.78 each 
E12 
Area Drain 
$62.78 each 
E13 
Backwater Valve / Sump Pump / Sewage Ejector 
$144 each 
- On-Site Sewage Systems
 These fees apply to any permit application where a septic system is affected by the project scope of work.
Row 
Description 
Fee 
F1 
New System 
$2,128 
F2 
Replacement of Leaching Bed 
$1,139 
F3 
Replacement of Septic Tank or Minor Repair of Part of a System 
$707 
F4 
Evaluation of System (no alterations required) 
$284 
F5 
Review of Clearances Only 
$284 
- Green Energy Systems
 These fees apply to projects where green energy system installations are a stand-alone project.
Row 
Description 
Fee 
G1 
Solar domestic hot water systems (serving individual dwellings) 
$144 
G2 
Solar domestic hot water systems (serving all other buildings) 
$776 
G3 
Solar photovoltaic systems (serving individual dwellings) 
$144 
G4 
Solar photovoltaic systems (serving all other buildings) 
$776 
G5 
Geothermal Systems 
$468 G6 
Wind Turbines (per turbine) 
$310 G7 
Drain water heat recovery unit (serving individual dwellings) 
$144 
- Zoning Review of Permit Applications
 Row 
Description 
Fee 
H1 
Infill Residential dwelling 
$400 
H2 
New single detached dwelling or new semi-detached dwelling 
$100 
H3 
New multiple unit residential buidings less than 4 storeys high (per building) 
$400 H4 
All other new mulitiple unit residential buildings and new non-residential projects (per building) 
$950 
H5 
Non-housing interior alterations (per unit) 
$200 
H6 Portables $200 
The following by-law applies to all applications submitted after December 31, 2023.
Our current fees listed below are summarized from Schedule A of Markham's Building By-law 2023-177.
 
Minimum Permit Fees
| Description | Fee | 
|---|---|
| Group C Residential construction | $125 | 
| Group A, B, D, E and F occupancies | $525 | 
| Private servicing of multiple lots (plumbing fees in addition to this fee) | $2,125 | 
| Non-residential Demolition | $1,092 | 
 
- Administrative Fees
 
Row Description 
Fee 
1.1 Transfer application to another permit applicant or change project address 
$300 
1.2 Transfer permit to another Owner 
$300 
1.3 Add additional contacts to permit record for Building Inspection correspondence $125 per permit record 1.4 Building complaint leading to issuance of an Order $100 1.5 Order to Comply 
$450 
1.6 Subsequent visit or file review to determine compliance with Order to Comply $125 per hour 
(minimum 1 h)1.7 Stop Work Order 
$1,500 
1.8 Unsafe Building 
$600 
1.9 Initial Site Visit related to Unsafe Building conducted after hours $125 per hour 
(minimum 3 h)1.10 Order Respecting Occupancy 
$1,200 
1.11 Subsequent Visits / File Review to determine compliance with an Unsafe Building or Order Respecting Occupancy 
$125 per hour 
(minimum 1 h during business hours; 3 h outside of business hours)1.12 Order to Comply or Stop Work Order issued prior to building permit 
50% of permit fee 
(maximum $5000)
1.13 Order Maintenance Fee $1,000 1.14 Additional Inspections due to non-remedied infraction 
$200 
1.15 Additional Inspection due to work not sufficiently complete 
$200 
1.16 Extend permit expiry date past 12 months 
$525 or permit fee paid, whichever is less 1.17 Suspended permit / incomplete 
$200 for housing 
$525 for non-housing
1.18 Permit Maintenance Fee for infill residential permits $2,000 1.19 Septic Maintenance Fee $300 1.20 Registration of an Order on Title $500 
- General Permit Fees
 
Row Description 
Fee 
2.1 
Pre-Application Review 
$100 
2.2 
Supplementary submissions, shop drawings, and permit revisions 
$125 per hour 
2.3 Resubmission to address incorrectly declared Applicable Law $300 2.4 Revisions to forms due to incorrectly declared information $250 2.5 Partial permit fee for non-housing (when requested after permit application) 
$1000 
2.6 Alternative Solution — first submission 
$3,000 for multiple-unit residential and non-residential 
$800 for low rise residential
2.7 Alternative Solution — supplementary submission 
$250 each 
2.8 Certified Model Supplemental Reviews (additional elevations, corner upgrade, rear upgrade, alternate floor layout, walk-out condition, look-out condition) $125 each 2.9 Change of Certified Model to existing Repeat Permit 
$300 plus difference in permit fees 
2.10 
Fee not listed in Building Bylaw 
$40 for every $1,000 of Construction Value 
2.11 
Remediation / demolition of premises used for production of illicit drugs 
$5,000 
2.12 
Reinstallation of a previously approved Air Supported Structure 
$1,000 
- Service Fees
 Row 
Description 
Fee 
3.1 
Certificate of Completion 
$200 
3.2 
Compliance Letter 
$200 
3.3 
Provincial License Applications (without a permit application) 
$500 
3.4 
Provincial License Applications (with a permit application) 
$250 
3.5 
Spatial Separation Agreements 
$500 
3.6 
Zoning Preliminary Review – Low Rise Residential 
$300 
3.7 
Zoning Preliminary Review – Interior alteration (including parking calculations) 
$750 per unit 
3.8 
Zoning Preliminary Review — multiple-unit residential and non-residential projects 
$1500 per building 
3.9 
Zoning Preliminary Review — Land Division 
$1000 per lot 
3.10 Zoning Preliminary Review — supplemental submissions $125 per hour 3.11 
Zoning Searches 
$75 
3.12 
Pre-Permit Consultation — per discipline 
$800 for first submission 
$300 for each resubmission
3.13 Reproduction of Documents $60 plus 110% cost of reproduction plus $125 per hour 
- New Buildings and Additions (including Mezzanines or New Intermediate Floors)
 Row 
Description 
Fee 
Group A Assembly 
A1 
Transportation Terminals 
$22.71 per square metre 
A2 
Portable classrooms (each) (new or relocated) 
$694 each 
A3 
Outdoor Pool 
$15.85 per square metre 
A4 
All Other Assembly Occupancies 
$27.29 per square metre 
Group B: Institutional 
A5 
All Institutional Occupancies 
$29.54 per square metre 
Group C: Residential 
A6 
Single Detached Dwelling (SDD) 
$20.63 per square metre 
A7 Infill Residential Dwelling $23.12 per square metre A8 
Multiple Unit buildings less than 4 storeys high 
$25.62 per square metre 
A9 
Multiple Unit buildings greater than 3 storeys, less than 13 storeys 
$25.62 per square metre 
A10 
Multiple Unit buildings greater than 12 storeys high, less than 66 storeys or 250 m in height 
$19.03 per square metre 
A11 Multiple Unit buildings greater than 65 storeys or 250 m in height $18.66 per square metre A12 
Repeat of Previously approved Certified Model 
$16.91 per square metre 
A13 
Hotel / Motel 
$27.29 per square metre 
A14 
Unfinished Basement / Foundations 
$7.04 per square metre 
A15 
Detached or semi-detached garage/carport 
$661 each 
A16 
Garage incorporating a dwelling unit (GDU) 
$1,927 each 
A17 
Repeat of previously approved GDU 
$1,197 each 
A18 
Accessory utility building (ie. Garden shed, Gazebo) less than 20 m2 
$142 each 
A19 
Accessory utility building (ie. Garden shed, Gazebo) 20 m2 or greater 
$910 each 
A20 Single Detached Dwelling Unit (SDD) less than 37 m2 in building area $910 each A21 
Deck / Balcony / Covered Porch (each) 
$142 each 
Group D: Business and Personal Services 
A22 
Shell Only (including unfinished basement) 
$17.60 per square metre 
A23 
Partitioned / Finished / Mezzanine 
$22.71 per square metre 
A24 
Temporary Real Estate Sales Office 
$2,677 each 
Group E: Mercantile 
A25 
Shell Only (including unfinished basement) 
$14.79 per square metre 
A26 
Partitioned / Finished / Mezzanine 
$19.36 per square metre 
Group F: Industrial 
A27 
Shell Only (including unfinished basement) 
$11.44 per square metre 
A28 
Partitioned / Finished / Mezzanine 
$15.83 per square metre 
A29 
Gas Station / Canopy, Car Wash 
$14.62 per square metre 
A30 
Repair garage 
$15.83 per square metre 
A31 
Parking Garage (underground, open air) 
$11.44 per square metre 
A32 
Farm Building 
$6.25 per square metre 
A33 
Rack Storage Systems regulated by the Building Code 
$11.44 per square metre 
All Occupancies 
A34 
Permanent Tent / Air supported structure 
$8.18per square metre 
A35 
Repair / reclad wall or replace roof structure 
$2.11 per square metre 
A36 
Ceiling (new or replacement) 
$0.57 per square metre 
A37 
Mechanical Penthouse 
$11.44 per square metre 
A38 
Temporary Building (Tent, Stages) 
$294 each 
A39 
Shoring (/m of length) 
$17.60 per square metre 
A40 
Underpinning (/m of length) 
$17.60 per square metre 
Designated Structures 
A41 
Communication Tower 
$420 each 
A42 
Crane Runway 
$625 each 
A43 
Exterior Storage Tank 
$420 each 
A44 
Pedestrian Bridge (/m of length) 
$48.76 per metre 
A45 
Retaining Wall (/m of length) 
$24.41 per metre 
A46 
Sign regulated by the Building Code 
$420 each 
- Alteration, Repair or Change of Use (Existing Construction)
 Row 
Description 
Fee 
Group A Assembly 
B1 
Restaurant 
$11.40 per square metre 
B2 
All other assembly occupancies 
$7.87 per square metre 
Group B: Institutional 
B3 
All institutional occupancies 
$7.87 per square metre 
Group C: Residential 
B4 
Accessory Apartment 
$20.63 per square metre 
B5 
All other Residential occupancies 
$7.87 per square metre 
B6 
Exterior door or door from garage into dwelling 
$465 each 
B7 
Below grade stair 
$465 each 
B8 
Elevator (Housing Permits only) 
$465 each 
Group D: Business and Personal Services 
B9 
All business and personal service occupancies 
$7.87 per square metre 
Group E: Mercantile 
B10 
Restaurant 
$11.40 per square metre 
B11 
All other mercantile occupancies 
$7.87 per square metre 
Group F: Industrial 
B12 
All industrial occupancies 
$7.18 per square metre 
All Occupancies 
B13 
Electromagnetic Locking Device 
$694 first device plus $140 per additional device 
B14 
Parking Structure Repair 
$2.11 per square metre 
B15 
Balcony Guard Replacement (/m of length) 
$2.55 per metre 
B16 
Window Replacement or Enlargement (each) 
$8.79 each 
- Demolition
 Row 
Description 
Fee 
Group C: Residential Housing 
C1 
Single / Semi-detached dwelling 
$709 each 
C2 
Accessory building serving residential housing 
$237 each 
All Other Occupancies 
C3 
Complete / Partial / Interior Demolition 
$0.20 per square metre 
($1,092 minimum fee)
- Mechanical and Fire Protection Work
 These fees apply to projects where mechanical or fire protection work is a stand-alone project.
Row 
Description 
Fee 
D1 
Heating, ventilation, air conditioning 
$1.37 per square metre 
D2 
Fire Alarm System (per storey) 
$457 per storey 
D3 
Replacement Annunciator/Control Panel only (per storey served) 
$457 per storey 
D4 
Sprinkler System 
$1.37 per square metre 
D5 
In-rack sprinkler System 
$1.37 per square metre 
D6 
Standpipe System (per riser) 
$179 per riser 
D7 
Emergency Power 
$879 
D8 
Emergency Lighting (per storey) 
$235 per storey 
D9 
Fireplace / Woodstove 
$142 
D10 
Heating plant replacement 
$229 
D11 
Special Ventilation Systems (each) 
$694 each 
- Plumbing
 Plumbing fees apply to all projects except for new single detached dwellings, new semi-detached dwellings, and new multiple unit residential buildings less than 4 storeys high.
Row 
Description 
Fee 
E1 
Residential Service Connection (per lot) 
$214 per lot 
E2 
Fixture 
$20.88 each 
E3 
Appliance 
$20.88 each 
E4 
Rain Water Hopper 
$20.88 each 
E5 
Conversion from Septic System to sewer 
$536 
E6 
Backflow preventer 
$321 (first device) $107 per additional devices 
E7 
Water service (/length in m) 
$20.88 per metre 
E8 
Building sanitary/storm drain, building sanitary/storm sewer (/length in m) 
$20.88 per metre 
E9 
Replacement or re-lining of water distribution piping (/length in m) 
$20.88 per metre 
E10 
Manhole 
$61.58 each 
E11 
Catchbasin 
$61.58 each 
E12 
Area Drain 
$61.58 each 
E13 
Backwater Valve / Sump Pump / Sewage Ejector 
$142 each 
- On-Site Sewage Systems
 These fees apply to any permit application where a septic system is affected by the project scope of work.
Row 
Description 
Fee 
F1 
New System 
$2,088 
F2 
Replacement of Leaching Bed 
$1,118 
F3 
Replacement of Septic Tank or Minor Repair of Part of a System 
$694 
F4 
Evaluation of System (no alterations required) 
$279 
F5 
Review of Clearances Only 
$279 
- Green Energy Systems
 These fees apply to projects where green energy system installations are a stand-alone project.
Row 
Description 
Fee 
G1 
Solar domestic hot water systems (serving individual dwellings) 
$142 
G2 
Solar domestic hot water systems (serving all other buildings) 
$762 
G3 
Solar photovoltaic systems (serving individual dwellings) 
$142 
G4 
Solar photovoltaic systems (serving all other buildings) 
$762 
G5 
Geothermal Systems 
$460 
G6 
Wind Turbines (per turbine) 
$305 
G7 
Drain water heat recovery unit (serving individual dwellings) 
$142 
- Zoning Review of Permit Applications
 Row 
Description 
Fee 
H1 
Infill Residential dwelling 
$315 
H2 
New single detached dwelling or new semi-detached dwelling 
$78 
H3 
New multiple unit residential buidings less than 4 storeys high (per building) 
$315 H4 
All other new mulitiple unit residential buildings and new non-residential projects (per building) 
$787 
H5 
Non-housing interior alterations (per unit) 
$131 
H6 Portables $131 
The following by-law applies to all applications submitted after December 31, 2022 and before January 1, 2024.
The 2023 fees listed below are summarized from Schedule A of Markham's Building By-law 2023-18.
 
Minimum Permit Fees
| Description | Fee | 
|---|---|
| Group C Residential construction | $125 | 
| Group A, B, D, E and F occupancies | $525 | 
| Private servicing of multiple lots (plumbing fees in addition to this fee) | $2,125 | 
| Non-residential Demolition | $1,092 | 
 
- Administrative Fees
 Row Description Fee 1.1 Transfer application to another permit applicant or change project address $300 1.2 Transfer permit to another Owner $300 1.3 Add additional contacts to permit record for Building Inspection correspondence $125 per permit record 1.4 Building complaint leading to issuance of an Order $100 1.5 Order to Comply $450 1.6 Subsequent visit or file review to determine compliance with Order to Comply $125 per hour 
(minimum 1 h)1.7 Stop Work Order $1,500 1.8 Unsafe Building $600 1.9 Initial Site Visit related to Unsafe Building conducted after hours $125 per hour 
(minimum 3 h)1.10 Order Respecting Occupancy $1,200 1.11 Subsequent Visits / File Review to determine compliance with an Unsafe Building or Order Respecting Occupancy $125 per hour 
(minimum 1 h during business hours; 3 h outside of business hours)1.12 Order to Comply or Stop Work Order issued prior to building permit 50% of permit fee 
(maximum $5000)1.13 Order Maintenance Fee $1,000 1.14 Additional Inspections due to non-remedied infraction $200 1.15 Additional Inspection due to work not sufficiently complete $200 1.16 Extend permit expiry date past 12 months $525 or permit fee paid, whichever is less 1.17 Suspended permit / incomplete $200 for housing 
$525 for non-housing1.18 Permit Maintenance Fee for infill residential permits $2,000 1.19 Septic Maintenance Fee $300 1.20 Registration of an Order on Title $500 
- General Permit Fees
 Row Description Fee 2.1 Pre-Application Review $100 2.2 Supplementary submissions, shop drawings, and permit revisions $125 per hour 2.3 Resubmission to address incorrectly declared Applicable Law $300 2.4 Revisions to forms due to incorrectly declared information $250 2.5 Partial permit fee for non-housing (when requested after permit application) $1000 2.6 Alternative Solution — first submission $3,000 for multiple-unit residential and non-residential 
$800 for low rise residential2.7 Alternative Solution — supplementary submission $250 each 2.8 Certified Model Supplemental Reviews (additional elevations, corner upgrade, rear upgrade, alternate floor layout, walk-out condition, look-out condition) $125 each 2.9 Change of Certified Model to existing Repeat Permit $300 plus difference in permit fees 2.10 Fee not listed in Building Bylaw $40 for every $1,000 of Construction Value 2.11 Remediation / demolition of premises used for production of illicit drugs $5,000 2.12 Reinstallation of a previously approved Air Supported Structure $1,000 
- Service Fees
 Row Description Fee 3.1 Certificate of Completion $200 3.2 Compliance Letter $200 3.3 Provincial License Applications (without a permit application) $500 3.4 Provincial License Applications (with a permit application) $250 3.5 Spatial Separation Agreements $500 3.6 Zoning Preliminary Review – Low Rise Residential $300 3.7 Zoning Preliminary Review – Interior alteration (including parking calculations) $750 per unit 3.8 Zoning Preliminary Review — multiple-unit residential and non-residential projects $1500 per building 3.9 Zoning Preliminary Review — Land Division $1000 per lot 3.10 Zoning Preliminary Review — supplemental submissions $125 per hour 3.11 Zoning Searches $75 3.12 Pre-Permit Consultation — per discipline $800 for first submission 
$300 for each resubmission3.13 Reproduction of Documents $60 plus 110% cost of reproduction plus $125 per hour 
- New Buildings and Additions (including Mezzanines or New Intermediate Floors)
 Row Description Fee Group A Assembly A1 Transportation Terminals $21.62 per square metre A2 Portable classrooms (each) (new or relocated) $661 each A3 Outdoor Pool $15.1 per square metre A4 All Other Assembly Occupancies $25.99 per square metre Group B: Institutional A5 All Institutional Occupancies $28.13 per square metre Group C: Residential A6 Single Detached Dwelling (SDD) $19.65 per square metre A7 Infill Residential Dwelling $22.02 per square metre A8 Multiple Unit buildings less than 4 storeys high $24.40 per square metre A9 Multiple Unit buildings greater than 3 storeys, less than 13 storeys $24.4 per square metre A10 Multiple Unit buildings greater than 12 storeys high, less than 66 storeys or 250 m in height $18.13 per square metre A11 Multiple Unit buildings greater than 65 storeys or 250 m in height $18.13 per square metre A12 Repeat of Previously approved Certified Model $16.11 per square metre A13 Hotel / Motel $25.99 per square metre A14 Unfinished Basement / Foundations $6.7 per square metre A15 Detached or semi-detached garage/carport $630 each A16 Garage incorporating a dwelling unit (GDU) $1,836 each A17 Repeat of previously approved GDU $1,140 each A18 Accessory utility building (ie. Garden shed, Gazebo) less than 20 m2 $136 each A19 Accessory utility building (ie. Garden shed, Gazebo) 20 m2 or greater $867 each A20 Single Detached Dwelling Unit (SDD) less than 37 m2 in building area $867 each A21 Deck / Balcony / Covered Porch (each) $136 each Group D: Business and Personal Services A22 Shell Only (including unfinished basement) $16.76 per square metre A23 Partitioned / Finished / Mezzanine $21.62 per square metre A24 Temporary Real Estate Sales Office $2,550 each Group E: Mercantile A25 Shell Only (including unfinished basement) $14.09 per square metre A26 Partitioned / Finished / Mezzanine $21.62 per square metre Group F: Industrial A27 Shell Only (including unfinished basement) $10.89 per square metre A28 Partitioned / Finished / Mezzanine $15.08 per square metre A29 Gas Station / Canopy, Car Wash $13.92 per square metre A30 Repair garage $15.08 per square metre A31 Parking Garage (underground, open air) $10.89 per square metre A32 Farm Building $5.96 per square metre A33 Rack Storage Systems regulated by the Building Code $10.89 per square metre All Occupancies A34 Permanent Tent / Air supported structure $7.79 per square metre A35 Repair / reclad wall or replace roof structure $2.01 per square metre A36 Ceiling (new or replacement) $0.54 per square metre A37 Mechanical Penthouse $10.89 per square metre A38 Temporary Building (Tent, Stages) $280 each A39 Shoring (/m of length) $16.76 per square metre A40 Underpinning (/m of length) $16.76 per square metre Designated Structures A41 Communication Tower $400 each A42 Crane Runway $596 each A43 Exterior Storage Tank $400 each A44 Pedestrian Bridge (/m of length) $46.44 per metre A45 Retaining Wall (/m of length) $23.25 per metre A46 Sign regulated by the Building Code $400 each 
- Alteration, Repair or Change of Use (Existing Construction)
 Row Description Fee Group A Assembly B1 Restaurant $10.85 per square metre B2 All other assembly occupancies $7.50 per square metre Group B: Institutional B3 All institutional occupancies $7.50 per square metre Group C: Residential B4 Accessory Apartment $19.65 per square metre B5 All other Residential occupancies $7.50 per square metre B6 Exterior door or door from garage into dwelling $443 each B7 Below grade stair $443 each B8 Elevator (Housing Permits only) $443 each Group D: Business and Personal Services B9 All business and personal service occupancies $7.50 per square metre Group E: Mercantile B10 Restaurant $10.85 per square metre B11 All other mercantile occupancies $7.50 per square metre Group F: Industrial B12 All industrial occupancies $6.83 per square metre All Occupancies B13 Electromagnetic Locking Device $661 first device plus $134 per additional device B14 Parking Structure Repair $2.01 per square metre B15 Balcony Guard Replacement (/m of length) $2.43 per metre B16 Window Replacement or Enlargement (each) $8.37 each 
- Demolition
 Row Description Fee Group C: Residential Housing C1 Single / Semi-detached dwelling $675 each C2 Accessory building serving residential housing $225 each All Other Occupancies C3 Complete / Partial / Interior Demolition $0.19 per square metre 
($1,092 minimum fee)
- Mechanical and Fire Protection Work
 These fees apply to projects where mechanical or fire protection work is a stand-alone project.
Row Description Fee D1 Heating, ventilation, air conditioning $1.31 per square metre D2 Fire Alarm System (per storey) $436 per storey D3 Replacement Annunciator/Control Panel only (per storey served) $436 per storey D4 Sprinkler System $1.31 per square metre D5 In-rack sprinkler System $1.31 per square metre D6 Standpipe System (per riser) $171 per riser D7 Emergency Power $838 D8 Emergency Lighting (per storey) $224 per storey D9 Fireplace / Woodstove $136 D10 Heating plant replacement $219 D11 Special Ventilation Systems (each) $661 each 
- Plumbing
 Plumbing fees apply to all projects except for new single detached dwellings, new semi-detached dwellings, and new multiple unit residential buildings less than 4 storeys high.
Row Description Fee E1 Residential Service Connection (per lot) $204 per lot E2 Fixture $19.89 each E3 Appliance $19.89 each E4 Rain Water Hopper $19.89 each E5 Conversion from Septic System to sewer $510 E6 Backflow preventer $306 (first device) $102 per additional devices E7 Water service (/length in m) $19.89 per metre E8 Building sanitary/storm drain, building sanitary/storm sewer (/length in m) $19.89 per metre E9 Replacement or re-lining of water distribution piping (/length in m) $19.89 per metre E10 Manhole $58.65 each E11 Catchbasin $58.65 each E12 Area Drain $58.65 each E13 Backwater Valve / Sump Pump / Sewage Ejector $136 each 
- On-Site Sewage Systems
 These fees apply to any permit application where a septic system is affected by the project scope of work.
Row Description Fee F1 New System $1,989 F2 Replacement of Leaching Bed $1,065 F3 Replacement of Septic Tank or Minor Repair of Part of a System $661 F4 Evaluation of System (no alterations required) $266 F5 Review of Clearances Only $266 
- Green Energy Systems
 These fees apply to projects where green energy system installations are a stand-alone project.
Row Description Fee G1 Solar domestic hot water systems (serving individual dwellings) $136 G2 Solar domestic hot water systems (serving all other buildings) $726 G3 Solar photovoltaic systems (serving individual dwellings) $136 G4 Solar photovoltaic systems (serving all other buildings) $726 G5 Geothermal Systems $439 G6 Wind Turbines (per turbine) $291 G7 Drain water heat recovery unit (serving individual dwellings) $136 - Zoning Review of Permit Applications
 Row 
Description 
Fee 
H1 
Infill Residential dwelling 
$300 
H2 
New single detached dwelling or new semi-detached dwelling 
$75 
H3 
New multiple unit residential buidings less than 4 storeys high (per building) 
$300 H4 
All other new mulitiple unit residential buildings and new non-residential projects (per building) 
$750 
H5 
Non-housing interior alterations (per unit) 
$125 
- Building Permit and Fee By-law 2021-114 [PDF] effective January 1, 2022 to December 31, 2022
 - Building Permit and Fee By-law 2020-140 [PDF] effective January 1, 2021 to December 31, 2021
 - Building Permit and Fee By-law 2019-136 [PDF] effective January 1, 2020 to December 31, 2020
 - Building Permit and Fee By-law 2019-20 [PDF] effective January 1, 2019 to December 31, 2019
 - Building Permit and Fee By-law 2017-150 [PDF] effective January 1, 2018 to December 31, 2018
 - Building Permit and Fee By-law 2016-148 [PDF] effective January 1, 2017 *Table 1 revised September 5, 2017 to December 31, 2017
 - Building Permit and Fee By-law 2015-166 [PDF] effective January 1, 2016 to December 31, 2016
 
Contact
101 Town Centre Boulevard
Markham, ON, L3R 9W3
Hours
8:30 AM to 4:30 PM