1.   | Masonry Veneer Ties & Attachments   | January 2025   | 
2.   | Moisture Barrier on Foundation Walls   | January 2025   | 
3.   | Principal Exhaust Fan Controls   | January 2025   | 
4.   | Adjustable Steel Columns   | January 2025   | 
5.   | Smoke Alarms (Part 9)   | January 2025   | 
6.   | Installations of Air Barrier at Windows and Doors   | January 2025   | 
7.   | Installations of Stairs on Ceramic or Marble Flooring   | January 2025   | 
8.   | Waterproof Wall Finish Around Bathtubs   | January 2025   | 
9.   | Air Barrier & Recessed Light Fixtures   | January 2025   | 
10.   | Masonry Construction in Cold Weather   | January 2025   | 
11.   | Notching and Drilling of Framing Members   | January 2025   | 
12.   | Footings – Placement of Concrete   | January 2025   | 
13.   | Flashing at Cold Room Concrete Porch Slab   | January 2025   | 
14.   | Fire Protection for Gas and Electric Ranges   | January 2025   | 
15.   | Support of Beams   | January 2025   | 
19.   | Supply and Return Air Ducts in Exterior Walls   | January 2025   | 
20.   | Steel Beam and Column Connection   | January 2025   | 
21.   | “Header-Wrap” Air Barrier   | January 2025   | 
22.   | Lateral Support of Foundation Walls   | January 2025   | 
24.   | Hot Water Piping Insulation   | January 2025   | 
27.   | Gas Fireplace Vent Duct Penetration of the Air Barrier   | January 2025   | 
28.   | Rooms Over Garages   | January 2025   | 
29.   | Building Drain Cleanout   | January 2025   | 
34.   | Vapour Barrier for 2LBS Closed Cell Spray Applied Polyurethane Foam Insulation   | January 2025   | 
36.   | Wet Venting   | January 2025   | 
37.   | 45 Minute Fire-Resistance Rating of Exposing Garage Walls   | January 2025   | 
38.   | Carbon Monoxide Detectors   | January 2025   | 
39.   | 45 Minute Fire Resistance Rating Wall with Rigid Insulation   | January 2025   | 
40.   | Vinyl Cladding of Walls Less Than 2 Feet to the Property Line   | January 2025   | 
41.   | Protection of Plumbing Systems from Contamination (Water Treatment Devices)   | January 2025   | 
42.   | Staggered Town Housings 45 Minute Fire-Resistance Rated Wall   | January 2025   | 
43.   | Exterior Insulation Finish Systems (EIFS) Housing   | January 2025   | 
44.   | Piping Protection from Frost   | January 2025   | 
45.   | Inspection of Fire Protection Systems   | January 2025   | 
47.   | Winter Construction (Protection from Freezing)   | January 2025   | 
48.   | Construction of Gable Ends in Housing with a Limiting Distance Less 1.2 merter (3’-11’)   | January 2025   | 
49.   | Residential Suites Over Commercial Suites   | January 2025   | 
52.   | Concrete Mixes for Housing   | January 2025   | 
53.   | Windows Over Stairs, Ramps & Landings   | January 2025   | 
54.   | Uniform Risers and Treads   | January 2025   | 
55.   | Energy Efficiency of Manufactured Windows for Buildings of Residential Occupancy   | January 2025   | 
56.   | Required Landings for Dwellings    | January 2025   | 
58.   | Slope of Roof Surfaces    | January 2025   | 
59.   | Plastic Water Service Pipe   | January 2025   | 
60.   | Swinging Door Standards, Performance and Resistance to Forced Entry for Housing   | January 2025   | 
61.   | Protection from Precipitation – Residential Occupancy (First & Second Planes of Protection)   | January 2025   | 
62.   | Loading on Guards   | January 2025   | 
63.   | Required Guards (Interior Stairs)   | January 2025   | 
64.   | Required Location of Guards (Adjacent Interior/Exterior Lower Surface)   | January 2025   | 
69.   | Landing Configurations for Dwelling Units   | January 2025   | 
70.   | Permitted Openings in Wall Assemblies   | January 2025   | 
72.   | Party Wall Construction   | January 2025   | 
73.   | Termination of Party Wall Between Dwellings   | January 2025   | 
74.   | Reduction in Thickness of Fire Separation by Beams and Joists   | January 2025   | 
75.   | Slip Resistance of Ramps and Stairs   | January 2025   | 
77.   | Water Conservation for Dwellings   | January 2025   | 
78.   | Duct Sealing for Dwellings   | January 2025   | 
79.   | Finger Jointed Lumber for Dwellings   | January 2025   | 
80.   | Sound Vibration for Building Services for Dwellings   | January 2025   | 
81.   | Permitted Openings in Wall Fire Separation   | January 2025   | 
82.   | Stud Wall Reinforcement for Future Grab Bars in Dwelling Units   | January 2025   | 
83.   | Egress from Dwelling Units   | January 2025   | 
84.   | Clearance to Electrical Conductors   | January 2025   | 
86.   | Ceramic Tile Flooring on Panel Type Subfloor   | January 2025   | 
87.   | Temperature Control in Dwelling Units   | January 2025   | 
88.   | Opening in Guards/Design to Prevent Climbing   | January 2025   | 
94.   | New Home Report   | January 2025   | 
95.   | Testing of Drainage and Venting Systems — Sewer Lateral Extensions   | January 2025   | 
96.   | Elevating Devices in Houses  | January 2025 | 
97.   | Size and Capacity of Water Service for House with One Dwelling Unit | January 2025 | 
98.   | Shoring Requirements for Housing Foundation Walls | January 2025 | 
99.   | Construction and Demolition Site Fencing   | January 2025   | 
101.   | Structural Sufficiency of Glass for Houses   | January 2025   | 
102.   | Conducting Inspections During COVID-19   | January 2025   | 
103.   | Plumbing System Sewer Inspection for Infill Housing   | January 2025   | 
104.   | Infill Housing Strategy - Non-Conformance with the Building Permit Documents   | January 2025   | 
105.   | Infill Housing Strategy - Start of Construction Inspections   | January 2025   | 
106.   | Dimensions for Runs and Rectangular Treads - Housing   | January 2025   | 
107.   | Fire Sprinkler of Furnace Rooms in Houses with Two Dwelling Units   | January 2025   | 
| 108. | Protection from Backflow | January 2025 |